W3.1_Khalid Almamari_ Cost evaluation of site survey


1. Problem Definition

This subject is for estimating 5 km2 quotation of the area of the concession area related to our company from a survey contractor is OMR 2,000,000. Is the quotation is appropriate? If it is not, how much is the site survey price?

Continue reading

Advertisements

W7.2_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from company itself or maintain the stuff as they are now?

Continue reading

W13_Khalid Almamari_Concept Selection of the Main Pipeline Project by using Matrix Analysis


  1. Problem Definition

Currently the produced water from skim tank at Gathering station is pumped to evaporation ponds using water disposal pump. Off late the water cut of wells have increased that resulted in more water being pumped to evaporation ponds and eventually flooding of ponds. There is an urgent need to address this problem on a long term basis.

Produced water treatment facilities and Water injection facilities are available at Production station. The company is planning to transport produced water from Gathering to Production station through 10 Km of pipeline.

Continue reading

W12_Khalid Almamari_Cost Estimation Technique for new HSE program project


  1. Problem Definition:

As a focal point of the my department in the HSE champion committee for 2014 as the HSE department started to take a main rule in the most of the company’s business, I thought to propose new program to them to be implemented with cost associated to apply it. This program provides a path to workplace safety excellence by making safe behavior and workplace conditions part of the work culture, thus preventing injuries and incidents. The program allows employees and members of supervision and management to use techniques needed to ensure the safety behavior of themselves, their colleagues and contractors working through conducting informal behavioral observation. This cost estimation could help the other department to make such decision.

Continue reading

W8_Khalid Almamari_Outsourcing of Concept Activities


  1. Problem Definition.

Due to the high loads of projects in the our engineering department, we may need to look for alternatives to chase up our progress in the concept stage and outsource as an option to handle them on time. It isn’t new way as the whole of worlds and most of the companies now a days are concentrating on their businesses and leave other to small and medium enterprises.

Continue reading

W7.1_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from company itself or maintain the stuff as they are now?

Continue reading

W7_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from the company itself or maintain the stuff as they are now?