W7.2_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from company itself or maintain the stuff as they are now?

Continue reading

Advertisements

W7.1_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from company itself or maintain the stuff as they are now?

Continue reading

W7_ Khalid Almamari_Economic Evaluation of Site Power’s Alternatives


  1. Problem Definition

The SCADA facility is using Diesel generators for power supply during its operation with small requirements in absent of OHL connection. Those generators require a lot of rental cost and maintenance through the whole year. However, the company power is available around the field and can be constructed but with little of capital investment to be connected to the power system. The questions is the selection of better option either to stop using diesel generators and buying power from the company itself or maintain the stuff as they are now?

Continue reading

W7_S.Algheilani_Project Scheduling Using Gantt Chart


  1. Problem definition

The project schedule is the tool that communicates what work needs to be performed, which resources of the organization will perform the work and the time frames in which that work needs to be performed. The project schedule should reflect all of the work associated with delivering the project on time. Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resources, necessary to deliver the project [1]. Continue reading

W7.0_Ahmed Al Azizi_ Installation of Oil Transfer Pumps Project


1. Problem Recognition, Definition and Evaluation

 

As a part from Field Development Program (FDP) it recommends introducing to upgrade the oil shipping facility. In this project two Oil transfer pumps to be installed in B station to increase the shipping capacity from 20,000 ppd to 50,000 ppd. In the below table a summary of project activities:

Continue reading

W7- Ali Hubais -Selection mobile phone by using Matrix Analysis


1. Problem Recognition

Now a day Mobile phone is become more advanced and there are a lot of new model comes every year and competition is become so wader so it is important to carefully select a Type of Phone that fits fit your expectations and needs. So using Matrix analysis a technique it will help the decision maker to select the best mobile phone that satisfies his/her needs.

Continue reading

W7_AsmaF_What’s happening with TKT-14 blog posting project


1. Problem Definition

Since the start of the distance learning phase until now – W7 – the team has been assigned to do 5 projects. One of the main projects is the blog posting. Many members of the team didn’t submit the post regularly. 8 out of 25 didn’t submit at least 5 – 6 posts.

Continue reading

W7_Hassan Albarrami_ Monitoring contractor performance using Earned Value Management (EVM)


W7_Hassan Albarrami_ Monitoring contractor performance using Earned Value Management (EVM)

1. Problem Definition

EVM is a power full technique which used to track project progress and forecast the future performance. It can help in meeting the scope within cost and schedule parameters, reducing or eliminating schedule delays, and reducing or eliminating cost overruns. The table below shows the definition for EV acronym:

Continue reading

W7_SuleimanAljabri_ The Ways To Deliver Progress Status


 

1. Problem Definition

In my previous plog I talked about Progress Reporting in a way that provides management with the level of detail that they need in order to interpret the overall health of the project. In this article, I give some recommendations on how to deliver that status to management and the project team that you will hopefully find to be very effective.

Continue reading